TBD
Multiple Locations
NAVIGATE has been managing multiple Senior Living facilities for Elevate valued in excess of $100M located throughout the country.
Project scope for these facilities include:
Memory Support, Assisted Living and Independent Living Facility
Lee Summit Senior Living Assisted Living & Memory Care
TBD
Eureka, MO
NAVIGATE managed pre-construction of the Corridor Redevelopment project for Eureka’s Iconic Old Towne Dinning, Shopping and Sports Center.
Project scope includes:
· City Wide Signage & Wayfinding Program
· Street Scape & Public Parking Lot Improvements
· Park Enhancements
· Pedestrian & Vehicular Corridor Improvements
· Sport Field Improvements
· Connectivity Enhancements Between Sports Venue & Old Town
· New Event Lawn & Food Truck Venue
TBD
Eureka, MO
NAVIGATE is managing pre-construction and construction of a new 24,000 SF, single-story joint municipal government center, which will consolidate City Hall and the Police Department from former old and outdated facilities. Project scope includes:
· Demolition of the Former City Hall Facility
· Constructing on the Site of the Existing City Hall & Police Department
· Board of Aldermen Chambers
· City Administration Staff Offices & Support Space
· Police Offices
· Detention Facilities
· Site Improvements Including Secure Parking, Public Parking, Stormwater Management
· Evidence Processing
· Training & Fitness Areas Include Simulation Training
TBD
Eureka, MO
NAVIGATE assisted the City of Eureka with various planning efforts for improvements to their park facilities.
Projects include:
Food Truck & Event Venue Concept Development
Pickleball Court Concept Planning
Park Master Planning
Concept Planning for Field Expansions,Concessions, Restrooms & Paving
TBD
City of Eureka, MO
NAVIGATE managed pre-construction and construction of renovations to the existing Eureka Public Works Facility.
Project scope included:
· Replacement of Exterior Siding, Roofing & Windows
· Interior Finish Upgrades—Flooring, Restroom Improvements, Painting & Lighting
· New Exterior Entry Canopy
TBD
St. Louis, MO
NAVIGATE is managing pre-construction for the Waterways project to support Forest Park Forever’s pursuit of Project Clear funds through the Metropolitan Sewer District (MSD).
Project scope includes:
· Round Lake: Replace Historic, Malfunctioning Fountain (Maintain Historic Character)
· New Channel to Jefferson Lake: Create New Channel to Extend River System to Jefferson Lake. Features Include a Cascade & Gravel Bar, Picnic Lawn & Meadow, Footbridge, Visitor Trails & SeatingArea
· Jefferson Lake: Create Cascading Waterfall & Overlook Along Clayton Avenue & Build Underground Waterflow Connection from Bowl to Jefferson Lake, Storm Management BMPS
TBD
Arnold, MO
NAVIGATE is managing both pre-construction and construction projects for Fox SchoolDistrict. Current projects include:
$44M Facility Upgrade Program
$44M Facility Upgrade Program
Comprehensive Maintenance Plan
District-Wide Turf Field Improvements
TBD
Union, MO
NAVIGATE managed pre-construction and construction of this $30.8M state-of-the-art County Detention Center, 911/EOC and Sheriff Station Renovation.
Project scope included:
· Addition of 57,500 SF for a 244-long-term bed detention center, which brings total capacity to 320 beds
· Addition of 4,580 SF to House a Dispatch, 911Call Center & EOC
· Cell Tower Modifications
· Renovation of Detention Center Kitchen
· Remodel of a 49,000 SF Sheriff Station including relocation of evidence storage and labs, as well as renovation of office space.
TBD
Olivette, MO
NAVIGATE is managing preconstruction and construction of these three projects, which extend Centennial Greenway from Warson Park to Dielman Road and add a node at the south side of Olive Road & I-170. Project scope includes:
· Federal Grant Compliance Management for LPA Program (599A)
· Improvements to Four Crosswalks (599D)
· New curbs and gutter, ADA improvements, andutility adjustments.
· Coordination with Commercial & Residential Property Owners
· Coordination with City of Olivette & MoDOT
· Trail Construction within Indian Meadows Park & City-Owned Parcel Behind Several Residential Properties
· Retaining Walls & Slope Stabilization
· BMP’s & Associated Plantings
· Landscaping, Fencing, Lighting, Signage & GRG Branding
TBD
St. Charles, MO
NAVIGATE managed pre-construction and construction of this Great Rivers Greenway project to connect two existing trailheads via bridges—218 feet tall and 270 feet tall—across Highways 364 and94. Project scope included:
· Manage LPA Program Process (Federal GrantCompliance Management)
· Signalized Pedestrian Crosswalk
· ADA Trailheads
· Major Excavation, Grading & Retaining Walls
· MODOT Right of Way Work
· Landscaping, Fencing, Signage & GRG Branding
TBD
St. Louis, MO
NAVIGATE is managing the preconstruction and construction of improvements to Maline Greenway. Project scope includes:
· 1.3-Mile New Trail
· 2 Pedestrian Bridges
· 2,000-feet Elevated Precast Concrete Boardwalk
· Creek Slope & Bed Stabilization
· Overhead Trail Protection Structure
· Parking Lot & Trailhead Construction
· Elevated Speed Table Crossing
· Roadway Improvements & Signalized Intersection at Ferguson Avenue
· Interpretive Signage
TBD
St. Louis, MO
NAVIGATE managed pre-construction and construction of improvements to Cliff Cave County Park. Project scope included:
· Park Lot & Trailhead
· 170-Foot-High River Bluff Overlook
· 70-Foot-Long Cliff Cave Road Pedestrian Overpass
· Street Enhancements & Signalized Intersection at Telegraph Road
· Creek Bed Stabilization & Restoration
· Comfort Stations
· 210-Foot-Long, 45-Foot-Tall Ravine Crossing
· Low Land Restoration
· Natural Bat Habitat Protection
· 2.5-Mile Trail
· Interpretive Signage